| No |
Date |
Working Area |
Project |
Main Work |
Cooperative or Approving Unit |
| 1 |
1997.8-1998.3 |
Yantai Shipbuilding Factory |
200 thousand-ton shipyard submarine construction |
The steel template submarine installment, the obstacle eliminates, the caisson gets up floats and so on |
Owner approval |
| 2 |
1998.6-7 |
Navigation Repairing Station of the Salvation Bureau |
Rescuing the No.15 Yantai Salvation Ship |
¡°No.15 Yantai Salvation¡±Ship rescuing, submarine video recording |
Owner approval |
| 3 |
1999.8-10 |
Shallow sea area of Liaohe Rive |
Abandons the oil well electricity-Oxygen Cutting, the demolition cuts the elimination |
Diameter §¶ 914mm abandons the oil field 13, the diameter §¶ 6m 8 steel sunk shafts, 33 ships submarine cuts and the demolition elimination and the burning torch |
Owner approval |
| 4 |
1999.11 |
Project chute of the Salvation Bureau |
Adjustmenting the dock project chute |
Chute adjusting, submarine video takeing, the tension bar cross handle submarine cuts, the slide submarine installment, the gauge survey, the original plastic slide demolision |
Owner approval |
| 5 |
2000.4-7 |
Huangdao wharf of Qingdao |
200 thousand-ton ore wharf submarine template salvaging |
Submarine clear silt, template electricity-Oxygen cutting salvaging |
Owner approval |
| 6 |
2000.10-11 |
Liaohe Oil Field |
Platform rescuing of ¡®No.1 Liaohai Working¡¯ |
The seabed survey, the crack seals off, the equipment salvaging and submarine cuts and so on |
Owner approval |
| 7 |
2001.7 |
Zhuangxi of Dongying |
The platform defends |
Oil drilling platform submarine clear silt underwater survey of No.5 Shenli Ship |
Owner approval |
| 8 |
2001.9-10 |
Qingshan Thermal Power Plant of Wuhan |
The discharge pipe seals off and the demolision |
The diameter §¶ 1420mm x 4 discharge pipes submarine electric welding seal off and a submarine electricity-oxygen cutting demolision |
Owner approval |
| 9 |
2001.12 |
Nanshangfang of Yantai |
No.3 big-mouth well washing of Nanshangfang |
The submarine clear silt, the heavy shop filters stone layer |
Owner approval |
| 10 |
2002.5 |
No.27-34 Berth, the 8th section of Xianglujiao Wharf, Dalian |
'WIENIAWSKI'Ship submarine visual inspection |
Submarine video recording and photo taking |
DNV Owner approval |
| 11 |
2002.5-8 |
Liaohe Oil Field |
Abandoning No.3 Yuedong Well |
the submarine survey of No.3 Yuedong Well, the submarine clear silt, submarine cuts, the submarine welding |
Owner approval |
| 12 |
2002.8 |
Difanggang Harbor of Yantai |
The submarine ultrasonic wave measures thick of Qilu Ship |
The submarine ultrasonic wave measures thick |
Owner approval |
| 13 |
2002.10 |
No.61, Lianyungang Harbor |
Submarine visual inspection of CHARMYL Ship |
Submarine video recording and photo taking |
BV Owner approval |
| 14 |
2002.11 |
Dayaowan Harbor of Dalian |
Submarine visual inspection of Lianhuaquan Ship |
Submarine video recording and photo taking |
GL Owner approval |
| 15 |
2003.1 |
Dayaowan Harbor of Dalian |
Submarine visual inspection of SHALAMAR Ship |
Submarine video recording |
ABS Owner approval |
| 16 |
2003.1 |
No.4 Anchoring Zone, Huangpu Harbor, Guangzhou |
Submarine visual inspection of Fukangkou Ship |
Submarine video recording |
NK Owner approval |
| 17 |
2003.3 |
Shengbaowang Shipbuilding Factory of Bohai Petroleum Company |
Submarine visual inspection of ILEANA Ship |
Submarine video recording |
LR Owner approval |
| 18 |
2003.3 |
Dagang Oil Field |
The platform especially examination of No.1 Ganghai |
The magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 19 |
2003.6 |
Anchoring Zone of Lianyungang |
Submarine visual inspection of M/V MIMI SELMER Ship |
Submarine video recording and photo taking |
GL Owner approval |
| 20 |
2003.8 |
Hongyanchi Power Plant of Xinjiang |
leak stopping of No.1 Machine pump of Hongyanchi Power Plant |
leak stopping of No.1 Machine pump |
Owner approval |
| 21 |
2003.9 |
Outside anchoring Zone of Shanghai |
Submarine visual inspection of PACQUEEN Ship |
Submarine video recording |
LR Owner approval |
| 22 |
2003.11 |
Sea area of Shantou |
Submarine visual inspection of 857 Hongsheng Ship |
Submarine exploration, submarine video recording |
Owner approval |
| 23 |
2004.1 |
Shanghai |
Salvaging of Molixiang Ship |
The submarine welding, submarine seals off, the difficult ship to get up floats |
Owner approval |
| 24 |
2004.2-3 |
Shengli Oil Field |
Examining of No.2 Working Platform |
The magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 25 |
2004.2 |
Salt Lake of Urumqi |
Digs the niter ship salvaging |
Sunken wreck salvaging |
Owner approval |
| 26 |
2004.5 |
Bohai Heavy Industry of Tianjin |
Examining of No.2 Shengli Platform |
The magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 27 |
2004.8-9 |
Bohai Oil Field of Zhonghai Petroleum |
Offshore pipeline sacrifice anode investigation and repair |
GPS, the submarine clear silt, the submarine electric potential survey, submarine cuts, the submarine installment, the submarine welding, the submarine video recording |
Owner approval |
| 28 |
2004.10 |
Bohai Oil Field of Zhonghai Petroleum |
Platform examination of No.36-1 Suizhong Oil Field |
(Aquatic, submarine) the magnetic powder test, the ultrasonic wave measure, the submarine electric potential survey, the submarine video recording thick |
CCS Owner approval |
| 29 |
2004.11 |
Xiamen Anchoring Zone |
The water examines replaces the shipyard to examine of Qingbaoshi Ship |
the submarine video recording, The rudder gap survey |
CCS Owner approval |
| 30 |
2004.12 |
Qingdao Anchoring Zone |
The water examines replaces the shipyard of CHRISTIAN RUSS |
the submarine video recording, the rudder gap survey |
GL Owner approval |
| 31 |
2005.1 |
No.33 of Rizhao Harbor |
Submarine rescue, salvaging of Tongli Ship |
Damages the position submarine video recording, the subaqueous survey damages the mouth size, seals off |
Owner approval |
| 32 |
2005.4 |
Shengli Oil Field |
Examination of No.1 Shengli Platform |
The magnetic powder test, the ultrasonic wave measure thick
|
CCS Owner approval |
| 33 |
2005.6 |
Ship Building New Factory of Dalian |
Examination of No.7 Shengli Platform |
The magnetic powder test, the ultrasonic wave measure thick, beam crack detection |
CCS Owner approval |
| 34 |
2005.6 |
Sea area of Chengbei |
Special examination of Chengbei B Platform |
Submarine video recording, the magnetic powder test, the electric potential survey, the ultrasonic wave measure thick |
CCS Owner approval |
| 35 |
2005.7 |
Shengli Oil Field |
Special examination of No.3 Shengli Platform |
the magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 36 |
2005.11 |
From Sea area of Dongying to Northwest Bay of Guangxi |
Protection of No.2 Tance Ship |
process protection, installment and submarine inspection work |
CCS |
| 37 |
2005.9-10 |
Taozi Bay of Yantai |
Sewage conduit repair project of Taozi Bay |
the sewage conduit carries on the repair, the transformation |
Owner approval |
| 38 |
2005.12 |
Lanshan of Rizhao |
Submarine rescue project of Hebeimeihao Ship |
Submarine sealing off, ship rescueing |
Owner approval |
| 39 |
2006.5 |
Ship Building New Factory of Dalian |
Examination of No.6 Shengli Platform |
the magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 40 |
2006.6 |
JZ20-2Gas Mine Sea Area |
JZ20-2 Pipeline inspection |
the electric potential survey, the ultrasonic wave measure, the submarine visual examination thick |
CCS Owner approval |
| 41 |
2006.7 |
Sea area of Chengbei |
Pipe shelf examination of A platform of Chengbei Oil Field |
Submarine video recording, the magnetic powder test, the ultrasonic wave measure thick, ultrasonic wave measure thick |
CCS Owner approval |
| 42 |
2006.8 |
BZ Oil Field Platform |
Examination of pipe shelf and platform of BZ oil field |
Submarine video recording, the magnetic powder test, the ultrasonic wave measure thick, ultrasonic wave measure thick |
CCS Owner approval |
| 43 |
2006.9 |
Caofeidian Sea Area |
Submarine cutting of No.1-9 Nanbao |
Submarine cutting of the abandoned oil well |
CCS Owner approval |
| 44 |
2006.10 |
Shengli Oil Field |
Examination of No.3 Shengli Platform |
the magnetic powder test, the ultrasonic wave measure thick |
CCS Owner approval |
| 45 |
2006.10 |
Tianjin Harbor |
Repairing of Taikanghai Ship |
the propeller submarine cuts |
CCS Owner approval |
| 46 |
2006.10 |
Caofeidian Sea Area |
Submarine cutting of No.1-17 Nanbao |
Submarine cutting of the abandoned oil well |
CCS Owner approval |
| 47 |
2006.12 |
Caofeidian Sea Area |
Examination of No.1-5 well of Nanbao |
the magnetic powder test |
CCS Owner approval |
| 48 |
2006.12 |
Beihai Harbor |
¡°MV XUAN VIET MY THOI¡± |
Submarine video recording and sealing |
Owner approval |
| 49 |
2006.12 |
Mazhi Anchoring Zone of Zhoushan |
Examination of Yong¡¯an Ship |
Submarine sealing |
Owner approval |
| 50 |
2006.12-2007.3 |
Qinhuangdao Wharf |
The marine petroleum tries to pick the installment not to damage the examination of Liaohe Oil Field |
Magnetic powder test/beam crack detection/ultrasonic testing |
CCS |
| 51 |
2007.1 |
Longkou Harbr |
Water examination replacing the shipyard examination of Qianjing Ship |
Submarine video recording |
ABS |
| 52 |
2007.4 |
Anchoring Zone of Longkou |
Examination of stranded DSMANA TEE |
Submarine video recording |
NK |